Big portfolios. Tight deadlines. Delivered early.

From 81-property inspection programs to 296 roofs before winter, here is how All Pro Construction handles projects most contractors turn down.

Deadline vs. delivered

Outlined bar = time allowed. Filled bar = time we took.

Multi-property, multi-state portfolio

26 days required

23 days delivered

Upscale, resort-style hotel

8 weeks quoted

26 days delivered

Industrial warehouse

30 days required

3 weeks delivered

81 reports in 23 days

Self-storage, retail, multifamily, office · 12 states

Multi-property, multi-state portfolio

81 inspection reports across 12 states, finished 3 days ahead of the refinancing deadline.

296 roofs in 120 days

Multifamily · Virginia

Large multifamily rehab

1,184 units in 296 buildings repaired before winter, with residents’ daily lives left undisturbed.

44 sites, 75 days

Self-storage · 5 states

Multi-property, multi-state repairs

44 job sites in 5 states reached substantial completion in 75 days, even with an ownership-ordered pause.

Saved $200,000

Hospitality · California coast

Upscale, resort-style hotel

A 36,443 SF cedar shake re-roof in 26 days, $200,000 below local bids, with guests barely affected.

150,000 SF in 3 weeks

Industrial · Storm-damaged, occupied

Industrial warehouse

A 150,000 SF roof replaced in 3 weeks through 7 straight days of storms, with tenants still operating.

Saved $990,000

Multifamily, 700+ units · Sale negotiation

Million dollar pipe

An independent pipe assessment cut a buyer’s $1,000,000 price demand to a $10,000 reduction.

27 VIP rooms in 2 weeks

140-room hotel · Augusta, GA

Hotel mold remediation

Crews on site in 72 hours and 27 VIP rooms ready in two weeks, in time for Masters week.

Mobilized in one weekend

Student housing · Near University of Kentucky

Student housing move-in rush

Called on a Friday evening, on site Monday, and every room ready before students arrived.

608 units in 112 days

Multifamily, 608 units · 21 buildings

Multifamily turnaround before winter

Life-safety, roofing, balconies, asphalt and pool fixes plus a full panel rewire, finished before the snow.

312 units in 65 days

Multifamily, 312 units · Coastal, next to a marina

Coastal multifamily repairs

Life-safety, roof, asphalt and salt-air corrosion repairs finished ahead of the summer season.

Saved several hundred thousand $

Multifamily · Sale negotiation

Roof and HVAC verification

A third-party inspection showed the roof had 10 years of life left and the HVAC units needed coil combing, not replacement.

Done in 75 days

Student housing · Multifamily complex

Student housing refinance repairs

Lender-required repairs finished in 75 days so the refinancing could close and students could move in.

Self-storage, retail, multifamily, office · 12 states

Multi-property, multi-state portfolio

The challenge
  • All property inspections had to be finished before the closing date of the new loan package.
  • Reports were required within 26 days because lender negotiations lagged while the deadline stayed fixed.
  • Inspectors had to be scheduled and sent to 12 states (TX, OK, IN, OH, NY, LA, MS, TN, IA, IL, MO, NV and CA), with site visits coordinated with asset and property managers, and no margin for error.
Our Solution

All Pro Construction completed and submitted all 81 inspection reports in 23 days, so the refinancing could be processed in time. We also stayed with the borrower throughout, which let the lender identify each property’s value for the loan.

About the project

81 properties from the West Coast to the Gulf Coast, up through the Midwest and into the upper Atlantic Coast: 65% self-storage, 35% retail, multifamily and office, including one 850,000 SF office tower. The borrower was at maturity and preparing to refinance the entire portfolio.

81 reports in 23 days

Time to complete all reports

26 days required

Delivered in 23 days 

Properties

81

States

12

Mix

65% Self-Storage

Largest asset

850,000 SF office tower

Multifamily · Virginia

Large multifamily rehab

The challenge
  • All repairs had to be completed within 8 months.
  • Work began in late September, so 296 roofs needed to be finished right away while Northeast winter was approaching.
  • Materials and labor had to be coordinated at scale, working with asset managers, property managers and residents so the community’s routine was not disrupted.
Our Solution

All Pro Construction assembled a workforce of 200, including 120 roofers, and completed all 296 roofs in 120 days. All repairs were finished in under 180 days, with work coordinated so residents were not inconvenienced.

About the project

1,184 units in 296 buildings across 85 acres in Virginia. The scope covered life-safety, roofing and interiors, as part of a multi-state portfolio.

296 roofs in 120 days

Time to complete all repairs

8 months required

Delivered under 180 days

Units

1,184

Buildings

296

Site

85 acres

Workforce

200 (120 roofers)

Self-storage · 5 states

Multi-property, multi-state repairs

The challenge
  • Work had to be substantially complete in 75 days and 100% complete in 120 days.
  • Materials and labor for different trades had to be scheduled across 44 properties.
  • Our team, asset managers and property managers had to coordinate as the needs of each property changed.
Our Solution

All Pro Construction reached substantial completion within 75 days, even after a project stoppage while ownership analyzed property needs. A flexible, adaptable pool of resources handled the evolving scope.

About the project

44 job sites across Texas, Missouri, Tennessee, Indiana and Nevada, mostly self-storage. Work was mainly asphalt, painting, fencing and concrete, with occasional HVAC, plumbing and electrical. The repairs were loan conditions.

44 sites, 75 days

Substantial completion

75 days required

Delivered in 75 days 

Job sites

44

States

TX, MO, TN, IN, NV

Trades

Asphalt, paint, fence, concrete

Driver

Loan conditions

Hospitality · California coast

Upscale, resort-style hotel

The challenge
  • The new roofing style needed approval from local authorities.
  • Management needed a short schedule to limit the effect on hotel operations and guests.
  • The unique roof design made material delivery and placement difficult without disturbing the hotel.
Our Solution

All Pro Construction installed an approved roof in 26 days, saving $200,000 compared with local contractors, with minimal impact on hotel operations and guests.

About the project

A California coastal hotel in urgent need of a new roof: 33,273 SF of cedar shake and 3,170 SF of flat roof, 36,443 SF in total, with new plywood sheathing. Asset management had been getting bids of $800,000 and up with an 8-week schedule.

Saved $200,000

Time to complete roof

8 weeks quoted

Delivered in 26 days 

Roof area

36,443 SF

Cedar shake

33,273 SF

Flat roof

3,170 SF

Savings

$200,000

Industrial · Storm-damaged, occupied

Industrial warehouse

The challenge
  • The insurance adjuster required the new roof within 30 days.
  • Major thunderstorms were forecast for 2 weeks of the construction window.
  • Materials had to be delivered and placed on a unusual roof without disrupting tenants.
Our Solution

All Pro Construction installed the 150,000 SF roof and repaired 30,000 SF of framing and sheathing in 3 weeks, through 7 straight days of storms, with minimal impact on warehouse tenants.

About the project

A rare roof structure: 120,000 SF of standing seam metal with gable sections tying into 30,000 SF of low-slope roof. Two major hail storms in 3 months caused leaks in occupied space and 30,000 SF of framing and sheathing damage.

150,000 SF in 3 weeks

Time to complete roof

30 days required

Delivered in 3 weeks 

Roof area

150,000 SF

Standing seam

120,000 SF

Low slope

30,000 SF

Framing repair

30,000 SF

Multifamily, 700+ units · Sale negotiation

Million dollar pipe

The challenge
  • Determine whether the buyer’s concern about imminent plumbing repairs was valid.
  • Analyze the galvanized piping to find how much useful life remained.
  • Give a neutral assessment of future repairs so both sides could move forward with the sale.
Our Solution

All Pro Construction inspected the galvanized plumbing on site and found 50 years of remaining useful life. Our client granted a $10,000 reduction in sales price for plumbing, saving $990,000.

About the project

A 700+ unit apartment community in sale negotiations. The buyer asked for a $1 million price reduction to cover future plumbing repairs on the property’s galvanized piping.

Saved $990,000

Price reduction for plumbing

$1,000,000 requested

$10,000 granted

Units

700+

Pipe

Galvanized

Useful life left

50 years

Client saved

$990,000

140-room hotel · Augusta, GA

Hotel mold remediation

The challenge
  • Property management needed 20 VIP rooms in 2 weeks.
  • Scope varied by room: some needed only paint and carpet, others needed full mold remediation.
  • Materials and labor had to be coordinated at speed without disrupting daily hotel operations.
Our Solution

All Pro Construction mobilized crews and materials within 72 hours and delivered 27 VIP rooms inside the two-week deadline. Additional rooms and repairs across the rest of the building were finished in the next 6 weeks, with asset managers, property managers and guests kept undisturbed.

About the project

Our client owned a 140-room hotel in Augusta, GA, near the Masters Golf Tournament. The property badly needed repairs including remediation, and management was already turning away requests for rooms that were not available. Timing was critical.

27 VIP rooms in 2 weeks

VIP rooms delivered in 2 weeks

20 rooms requested

27 rooms delivered

Hotel size

140 rooms

Mobilized in

72 hours

VIP rooms

27 in 2 weeks

Remaining work

6 more weeks

Student housing · Near University of Kentucky

Student housing move-in rush

The challenge
  • The client needed rooms ready for University of Kentucky students within 3 weeks.
  • All Pro was called on a Friday evening and asked to be on site, ready to work, the following Monday.
  • Materials and labor had to be in place over the weekend without disrupting the client as it took control of the property.
Our Solution

All Pro Construction mobilized crews and materials over the weekend. Painting and freshening up of all rooms was finished in time, and every student moved in without delay or inconvenience.

About the project

Our client took control of a student housing complex near the University of Kentucky just as the semester was about to begin, with no rooms available for incoming students.

Mobilized in one weekend

Deadline

3 weeks

Call received

Friday evening

On site

Monday

Work

Paint and refresh all rooms

Multifamily, 608 units · 21 buildings

Multifamily turnaround before winter

The challenge
  • The broad scope needed several trades and their materials on site at the same time to beat approaching winter weather.
  • Our client asked for an immediate property inspection after taking control.
  • Trades, materials and labor had to be coordinated without disrupting the daily routine of the property and residents.
Our Solution

All Pro Construction mobilized and coordinated the trades and material deliveries, completed the entire scope, and rewired the electric panels throughout the property in 112 days with a labor force of over 70, with minimal effect on residents.

About the project

Our client took possession of a portfolio that included a 21-building, 608-unit multifamily property. Inspection found life-safety issues, needed asphalt repairs, roof replacement, deteriorating balconies and pool violations, with snow and ice on the way.

608 units in 112 days

Buildings

21

Units

608

Labor force

70+

Duration

112 days

Multifamily, 312 units · Coastal, next to a marina

Coastal multifamily repairs

The challenge
  • Suppliers and several resources had to be coordinated for the project.
  • After taking control, our client requested a property condition report.
  • Trades, materials and labor had to work without disrupting residents, the property’s daily routine and the nearby marina.
Our Solution

All Pro Construction mobilized quickly, coordinated the work and material deliveries, and completed the entire scope, including rewiring the electric panels throughout the property, in 65 days with crews totaling 40 workers, with minimal effect on residents.

About the project

Our client took possession of a coastal multifamily property with 11 buildings and 312 units. Inspection found life-safety issues and needed asphalt repairs, roof repairs and exterior repairs from salt air corrosion, all to be addressed before summer.

312 units in 65 days

Buildings

11

Units

312

Crew

40 workers

Duration

65 days

Multifamily · Sale negotiation

Roof and HVAC verification

The challenge
  • Roof and HVAC verification
    Our client asked for a third-party inspection to verify whether the buyer’s claimed repairs were needed.
  • We had to confirm whether the alleged repairs actually reduced the property’s value.
  • All Pro’s master-licensed HVAC and plumbing professionals inspected the HVAC units and the roof in detail.
Our Solution

All Pro found the roof still had 10 years of useful life and did not need replacing now. The HVAC units did not need replacement either, only coil straightening (combing), at about $7K total versus $15K per unit. The result was savings of several hundred thousand dollars for our client.

About the project

Our client was negotiating a sale price with a buyer who claimed the property needed a new roof and replacement of 33 HVAC units. The buyer put HVAC units at $11-15K each and the roof replacement at $550,000.

Saved several hundred thousand $

Buyer’s roof claim

$550,000

HVAC units claimed

33

Roof life left

10 years

Coil combing

$7K total

Student housing · Multifamily complex

Student housing refinance repairs

The challenge
  • Repairs were time sensitive: the refinancing could not finalize until they were done, and units were needed for students as the semester began.
  • All Pro had to mobilize fast and use all available resources and material suppliers.
  • Repairs needed a quick turnaround with minimal effect on students’ daily routine.
Our Solution

All Pro Construction mobilized quickly, worked with property management and material suppliers to build a plan and schedule, and finished within the 75-day timeline with crews totaling 30 workers, with minimal impact on student residents.

About the project

Our client owned a multifamily student housing complex and was refinancing. The new lender required repairs before closing: life safety, roof replacement, stairs replacement, painting, and exterior repairs such as siding, gutters and asphalt.

Done in 75 days

Time to complete repairs

75-day timeline

Completed within 75 days

Crew

30 workers

Timeline

75 days

Scope

Life safety, roof, stairs, exterior

Driver

Lender requirement